Inside the 1.5–4.0 t Electric Forklift Line in Shandong

Corporate News

The 1.5–4.0 t counterbalance range is built under one roof in Shandong. Here is the production flow behind each truck, from steel plate to a tested machine ready for export packing.

One roof, from steel plate to tested truck

The facility integrates machining, welding, powder coating, final assembly and a full-machine performance test line. Keeping these processes in-house is how quality stays consistent across the 1.5–4.0 t platforms and how 30–45 working day lead times are held for standard models.

  • Welding stations for mast and chassis assemblies
  • Component test benches for hydraulic and drive systems
  • Powder coating before final assembly
  • 100% finished-machine load test

The platform behind the range

Every model from 1.5 t to 4.0 t uses the same 76.8 V (80 V platform) lithium architecture, offered as LiFePO4 packs in 125 Ah, 150 Ah and 202 Ah ratings, or as lead-acid. The lithium packs carry a 5-year / 10,000-hour cell warranty, and the BMS manages charge and discharge across the shift.

Mast configuration follows the application: a 3,000 mm two-stage mast is standard, with 4,500 mm and 6,000 mm three-stage masts available on request. Attachments such as side shifters and fork positioners are fitted on the same line.

Lead time: 30–45 working days after deposit (standard models); custom masts, attachments or brand colours add 5–10 working days.
Forklift masts, carriages and forks on an overhead conveyor entering the coating booth
Powder coating line.
Electric forklifts on the final assembly line in a manufacturing plant
Final assembly before testing.
Stand-on electric stacker with a raised mast, studio view
Warehouse stacker, studio view.

Customisation without leaving the line

OEM and ODM work is handled inside the same production flow: colours, decals and manuals under the buyer's brand, plus parameter selection and configuration advice before the order is confirmed. Customisation changes the schedule, not the process — every unit still passes the load test.

FS-CPD30 3.0 t electric forklift on the factory test road — 30-second clip, no autoplay.